CurrentProjects
|
Manhattan Family Courthouse -
dormitory authority
state of new york
This project consisted of a four (4) Phase
renovation and modernization to this Family Court Facility
in lower New York City, while the courts remained
operational.
Phase 1) $1,400,000 Repair of active
foundation leaks using epoxy injection. Replace coils and
filters to 13 main air handlers. Replace fan shafts &
bearings. Replace genset fuel oil tank
Phase 2) $ 2,300,000 Remove and replace seven
major exterior columns to accommodate lobby expansion. Phase
3) $39,000,000 Demo 140,000sf of deteriorated exterior stone
cladding, installed new unitized granite curtain wall panel
system (including operable window units), provided new
roofing, soffits, granite pavers, site work, metal panel
wall system (back of building) handrails, new storefronts at
lobby. The lobby expansion added 15,000sf and enabled the
installation of a dedicated air handling unit and a
thermally efficient storefront to correct the thermal
comfort problems that had plagued the original lobby.
Upgrade fire alarm components & sprinklers. Provided custom
wood ceiling and terrazzo flooring and utilized custom
overhead protection system in the lobby to permitting
uninterrupted court operations during reconstruction. Phase
4) $22,000,000 The Manhattan Family Court upgrade and
renovation project is currently entering the 4th phase
of construction. This Phase will include the demo and
renovation of 13 existing courtrooms and the addition of 2
new courtrooms with all incidental offices and support
facilities. The bidding is complete and within budget.
|
|
King's County Criminal
Courthouse -
new york city
department design and construction
Morganti
is providing the construction management services the
interior renovation to the Courthouse. The renovations are
to be phased and completed while the facility remains fully
operational. The project calls for the renovation of
approximately 264,000 sf, of this 11-story courthouse that
was constructed in 1932. The Building is a steel framed
structure with concrete floors and masonry walls. The
Courthouse’s 26 original courtrooms, the main and first
floor lobbies will be renovated. The courthouse building
also contains King County’s central booking facility that
will receive significant renovations. The facility currently
occupies various portions of the sub-basement, basement and
1st floor.The project will consolidate the facility to the
basement and 1st floor. The pre-arraignment holding
facilities adjacent the 1st floor courtrooms will also be
renovated. Renovations will include new holding facilities
and detainment areas. The renovation work will proceed while
the facility remains fully operational.The project will be
completed in phases and is required to achieve a Silver LEED
rating. |
|
Lincoln Park Academy -
St. Lucie County
school District
This
project consists of demolition of existing buildings 1 -9,
11-13, 15 – 20, 24 and 27, new construction of a 66,464sf
2-story classroom building, new 33,600sf cafeteria building, sitework and landscaping. The construction takes place on a
6th-12th grade campus that will remain occupied
and fully-functional throughout construction. |
|
Northwest Middle School and
High School
-
Guilford county
school board
The Morganti Group, partnered with Horus
Construction, has been awarded the construction management
of
$6,488,601 New auxiliary gym and classrooms addition at
Northwest Middle School and the
3,000,000 Site improvements for traffic
control and improvements to athletic facilities at Northwest
High School. |
Indiantown Middle School -
Martin County
School District
Construction Documents
The Morganti Group has
recently been
awarded this Indiantown Middle School
Cafetorium and
Classroom Building Addition
project consisting of the
construction, remodel and renovation of school facilities as needed to
provide current code compliance and meet the requirements of the Martin
County Schools Facility List. |
|
Lynch, Blanton, Bay Vista and
Plumb
Elementary Schools
-
Pinellas county
public schools
This
multi-project contract includes additions and renovations to
4 schools within Pinellas County School District.
Each project has
been designed to relieve overcrowding and ensure compliance
with the criteria established by the Class Size Reduction
Amendment to the state constitution.
Bay
Vista Fund Elementary School -
12,000sf Classroom Building
Renovation/Addition
Lynch Elementary School -
20,000sf Classroom Building
Renovation/Addition
Blanton
Elementary School -
12,000sf Classroom Building
Renovation/Addition
Plumb
Elementary School
- HVAC Renovation
Each
school will remain occupied throughout construction. |
|
Palm Lake
Elementary School
-
orange county
public schools
This renovation / addition to Palm Lake
Elementary School consists of the addition of new classrooms
and ancillary areas and renovation of the existing
facility. Site utilities and parking/driveways will be
improved, and the existing buildings are to be upgraded to
current code and school program Space Requirements. |
|
Metrowest
Elementary School
-
orange county
public schools
This renovation / addition to Metrowest
Elementary School consists of the addition of new classrooms
and ancillary areas and renovation of the existing
facility. Site utilities and parking/driveways will be
improved, and the existing buildings are to be upgraded to
current code and school program Space Requirements. |
Entrance Gateway
and Renovation Project -
Hillsborough
community College
Construction Documents
The Morganti Group has been awarded the
construction management of a campus entrance gateway and
approximately 0.5 to 0.7 miles of entrance road at the
Brandon Campus located at 10414 E. Columbus Dr., Tampa,
Florida 33619 as well as the remodeling/renovation of
Building 601, Sciences, and select spaces in Building 602,
Administration, at the College’s Brandon Campus. In
addition, this project consists of the remodeling of
Building 601 which houses classrooms and science
laboratories consisting of approximately 13,000 square feet
of space and the general renovation of 31,600 gross square
feet to evaluate and upgrade as needed all electrical,
mechanical, telephone, fire alarm and safety systems in
order to ensure their compliance with the Florida Building
Code and the Florida Fire Prevention Code. The project may
require phasing to allow continued operations. The target
date for occupancy is the Summer Term in 2009. |
|
Continuing Services Contract
-
Florida Atlantic
university
This continuing services contract has
been awarded to the Morganti Group to service all 6 FAU
campuses’ needs. |
Continuing Services Contract
-
st. lucie county
school district
This continuing services contract has been
awarded to the Morganti Group to service all District
campuses’ needs. |
|
Roger Putnum VoTech High School
-
city of
springfield
This
new school will encompass the latest technology has to offer
in each division of Vocational Education: Automotive
Technologies, Manufacturing Technologies, Fashion
Technologies, Hairdressing/Barbering, Auto Body Repair,
Electrical, Cosmetology, Carpentry, Electronics, Machine
Drafting, Plumbing/Heating, Cooperative Work Experience. |
Annie Fisher Magnet School
-
city of hartford
The project
includes construction of a 20,000 s.f. addition consisting
of the following: Library, Computer Lab, Cafeteria,
Kitchen, and four new fourth grade classrooms.
Renovations to the
existing 100,000 s.f. facility includes: asbestos abatement,
demolition, and construction of new program space. New
sprinkler system, exterior windows and doors. Mechanical
upgrades including new boilers and air conditioning.
Electrical upgrades including new electrical service,
addition of two micro turbines and emergency generator.
Plumbing upgrades including all new bathrooms. Site and
civil work including new landscaping and play areas. New
front entrance with canopy and parking/parent drop-off area
as well as new off-street bus drop off area, and security/
exterior lighting. |
Newtown High School
-
newtown public
schools
Originally built in 1970 and expanded in 1997 to accommodate
a population of 1,125 students, Newtown High School required
further expansion in 2007 to meet an increase in population
to 2,022 students. As a result, a 73,000 s.f. addition to
the existing 285,000 s.f. facility was needed to fulfill all
educational needs. The added space houses the new “ninth
grade center” and includes a new “cafetorium”, warming
kitchen, classrooms, conference rooms, computer labs,
guidance department and faculty support areas. Renovations
to the existing facility include a 4,000 s.f. expansion of
the existing gymnasium that also required the complete
removal and replacement of existing roof and structural
members to accommodate the increased ceiling height
requirements. Additional renovations include
reconfiguration of administrative offices, athletic
departments, conference rooms and associated
mechanical/electrical, and fire alarm systems to fulfill all
present building code requirements. |
|
Gilmartin Elementary School
-
city of waterbury
|
|
Hillsborough Health Department
Admin. Building
-
Florida
Department of Health
Drawings.zip
Spec Sections.zip
Bid Package 1.pdf
In
addition to the demolition and new construction of the 13,900sf
Health Department Administration Building this project involves
many complex site issues including the removal and mitigation of
existing trees, removal of an old storm-water system including
11 structures, removal and modification of existing utility
services, abatement of hazardous materials, monitoring of
underground wells and conservation of existing wetlands. |
Hernando County Health Department
Admin. Building
-
Florida
Department of Health
BidPackage3.zip
BidPackage3 Addendum 1.zip
This 41,310sf Hernando County Health Department Administration
Building is an expansion of the existing Hernando County FL
Department of Heath campus. |
PBC Tax Collector Offices -
palm beach county tax
collector
This 20,000sf Client Services Center build-out of the Palm
Beach County Tax Collectors Office is located in the Atlantis
Plaza II and has been
designed as a 1-story office building space with 24 high
ceilings and on-site
parking. This much needed facility will consolidate the offices
for the Tax Collector centralizing their position in Palm Beach
County government.
|
|
Continuing Services Contract
-
Florida
Department of juvenile justice
This continuing services contract has
been awarded to the Morganti Group to service all to cover
all DJJ facilities across the state. |
Continuing Services Contract
-
department of
management services
This continuing services contract has
been awarded to the Morganti Group to service all to cover
all DMS facilities across the state. |
| |
| |
|
|