CurrentProjects


Manhattan Family Courthouse - dormitory authority state of new york

This project consisted of a four (4) Phase renovation and modernization to this Family Court Facility in lower New York City, while the courts remained operational. 

Phase 1) $1,400,000 Repair of active foundation leaks using epoxy injection. Replace coils and filters to 13 main air handlers. Replace fan shafts & bearings. Replace genset fuel oil tank

Phase 2) $ 2,300,000 Remove and replace seven major exterior columns to accommodate lobby expansion. Phase 3) $39,000,000 Demo 140,000sf of deteriorated exterior stone cladding, installed new unitized granite curtain wall panel system (including operable window units), provided new roofing, soffits, granite pavers, site work, metal panel wall system (back of building) handrails, new storefronts at lobby. The lobby expansion added 15,000sf and enabled the installation of a dedicated air handling unit and a thermally efficient storefront to correct the thermal comfort problems that had plagued the original lobby.  Upgrade fire alarm components & sprinklers. Provided custom wood ceiling and terrazzo flooring and utilized custom overhead protection system in the lobby to permitting uninterrupted court operations during reconstruction. Phase 4) $22,000,000 The Manhattan Family Court upgrade and renovation project is currently entering the 4th phase of construction.  This Phase will include the demo and renovation of 13 existing courtrooms and the addition of 2 new courtrooms with all incidental offices and support facilities.  The bidding is complete and within budget.

King's County Criminal Courthouse - new york city department design and construction

Morganti is providing the construction management services the interior renovation to the Courthouse. The renovations are to be phased and completed while the facility remains fully operational. The project calls for the renovation of approximately 264,000 sf, of this 11-story courthouse that was constructed in 1932. The Building is a steel framed structure with concrete floors and masonry walls. The Courthouse’s 26 original courtrooms, the main and first floor lobbies will be renovated. The courthouse building also contains King County’s central booking facility that will receive significant renovations. The facility currently occupies various portions of the sub-basement, basement and 1st floor.The project will consolidate the facility to the basement and 1st floor. The pre-arraignment holding facilities adjacent the 1st floor courtrooms will also be renovated. Renovations will include new holding facilities and detainment areas. The renovation work will proceed while the facility remains fully operational.The project will be completed in phases and is required to achieve a Silver LEED rating.

Lincoln Park Academy - St. Lucie County school District

This project consists of demolition of existing buildings 1 -9, 11-13, 15 – 20, 24 and 27, new construction of a 66,464sf 2-story classroom building, new 33,600sf cafeteria building, sitework and landscaping. The construction takes place on a 6th-12th grade campus that will remain occupied and fully-functional throughout construction.

Northwest Middle School and High School - Guilford county school board

The Morganti Group, partnered with Horus Construction, has been awarded the construction management of $6,488,601 New auxiliary gym and classrooms addition at Northwest Middle School and the 3,000,000 Site improvements for traffic control and improvements to athletic facilities at Northwest High School.        

Indiantown Middle School - Martin County School District
Construction Documents
The Morganti Group has recently been awarded this Indiantown Middle School Cafetorium and Classroom Building Addition project consisting of the construction, remodel and renovation of school facilities as needed to provide current code compliance and meet the requirements of the Martin County Schools Facility List.

Lynch, Blanton, Bay Vista and Plumb Elementary Schools - Pinellas county public schools

This multi-project contract includes additions and renovations to 4 schools within Pinellas County School District. Each project has been designed to relieve overcrowding and ensure compliance with the criteria established by the Class Size Reduction Amendment to the state constitution. 

Bay Vista Fund Elementary School - 12,000sf Classroom Building Renovation/Addition

Lynch Elementary School - 20,000sf Classroom Building Renovation/Addition

Blanton Elementary School - 12,000sf Classroom Building Renovation/Addition

Plumb Elementary School - HVAC Renovation

Each school will remain occupied throughout construction.

Palm Lake  Elementary School - orange county public schools

This renovation / addition to Palm Lake Elementary School consists of the addition of new classrooms and ancillary areas and renovation of the existing facility.  Site utilities and parking/driveways will be improved, and the existing buildings are to be upgraded to current code and school program Space Requirements.

Metrowest Elementary School - orange county public schools

This renovation / addition to Metrowest Elementary School consists of the addition of new classrooms and ancillary areas and renovation of the existing facility.  Site utilities and parking/driveways will be improved, and the existing buildings are to be upgraded to current code and school program Space Requirements.

Entrance Gateway and Renovation Project  - Hillsborough community College
Construction Documents
The Morganti Group has been awarded the construction management of a campus entrance gateway and approximately 0.5 to 0.7 miles of entrance road at the Brandon Campus located at 10414 E. Columbus Dr., Tampa, Florida 33619 as well as the remodeling/renovation of Building 601, Sciences, and select spaces in Building 602, Administration, at the College’s Brandon Campus. In addition, this project consists of the remodeling of Building 601 which houses classrooms and science laboratories consisting of approximately 13,000 square feet of space and the general renovation of 31,600 gross square feet to evaluate and upgrade as needed all electrical, mechanical, telephone, fire alarm and safety systems in order to ensure their compliance with the Florida Building Code and the Florida Fire Prevention Code.  The project may require phasing to allow continued operations. The target date for occupancy is the Summer Term in 2009.

Continuing Services Contract - Florida Atlantic university
This continuing services contract has been awarded to the Morganti Group to service all 6 FAU campuses’ needs.

Continuing Services Contract - st. lucie county school district
This continuing services contract has been awarded to the Morganti Group to service all District campuses’ needs.

Roger Putnum VoTech High School - city of springfield
This new school will encompass the latest technology has to offer in each division of Vocational Education: Automotive Technologies, Manufacturing Technologies, Fashion Technologies, Hairdressing/Barbering, Auto Body Repair, Electrical, Cosmetology, Carpentry, Electronics, Machine Drafting, Plumbing/Heating, Cooperative Work Experience.

Annie Fisher Magnet School - city of hartford
The project includes construction of a 20,000 s.f. addition consisting of the following:  Library, Computer Lab, Cafeteria, Kitchen, and four new fourth grade classrooms.  Renovations to the existing 100,000 s.f. facility includes: asbestos abatement, demolition, and construction of new program space. New sprinkler system, exterior windows and doors. Mechanical upgrades including new boilers and air conditioning. Electrical upgrades including new electrical service, addition of two micro turbines and emergency generator. Plumbing upgrades including all new bathrooms. Site and civil work including new landscaping and play areas. New front entrance with canopy and parking/parent drop-off area as well as new off-street bus drop off area, and security/ exterior lighting. 
Newtown High School - newtown public schools
Originally built in 1970 and expanded in 1997 to accommodate a population of 1,125 students, Newtown High School required further expansion in 2007 to meet an increase in population to 2,022 students.  As a result, a 73,000 s.f. addition to the existing 285,000 s.f. facility was needed to fulfill all educational needs.  The added space houses the new “ninth grade center” and includes a new “cafetorium”, warming kitchen, classrooms, conference rooms, computer labs, guidance department and faculty support areas.  Renovations to the existing facility include a 4,000 s.f. expansion of the existing gymnasium that also required the complete removal and replacement of existing roof and structural members to accommodate the increased ceiling height requirements.  Additional renovations include reconfiguration of administrative offices, athletic departments, conference rooms and associated mechanical/electrical, and fire alarm systems to fulfill all present building code requirements.

Gilmartin Elementary School - city of waterbury

The City of Waterbury has hired The Morganti Group, Inc. for Pre-construction Services and Construction Phase Services associated with the design and construction of the new 76,000 s.f. elementary school. The new 550 student facility will be constructed in the parking area of the existing Gilmartin Elementary School building and will replace the present school upon completion.

Hillsborough Health Department Admin. Building - Florida Department of Health
Drawings.zip
Spec Sections
.zip
Bid Package 1.pdf

In addition to the demolition and new construction of the 13,900sf Health Department Administration Building this project involves many complex site issues including the removal and mitigation of existing trees, removal of an old storm-water system including 11 structures, removal and modification of existing utility services, abatement of hazardous materials, monitoring of underground wells and conservation of existing wetlands.
Hernando County Health Department Admin. Building - Florida Department of Health
BidPackage3.zip
BidPackage3 Addendum 1.zip
This 41,310sf Hernando County Health Department Administration Building is an expansion of the existing Hernando County FL Department of Heath campus.  
PBC Tax Collector Offices - palm beach county tax collector
This 20,000sf Client Services Center build-out of the Palm Beach County Tax Collectors Office is located in the Atlantis Plaza II and has been designed as a 1-story office building space with 24 high ceilings and on-site parking. This much needed facility will consolidate the offices for the Tax Collector centralizing their position in Palm Beach County government.

Continuing Services Contract - Florida Department of juvenile justice
This continuing services contract has been awarded to the Morganti Group to service all to cover all DJJ facilities across the state.

Continuing Services Contract - department of management services
This continuing services contract has been awarded to the Morganti Group to service all to cover all DMS facilities across the state.
 
 
last update: 07/07/2010